12/11/2023 0 Comments Cloud nine reunion tower![]() The shop drawing and submittal process was a highly coordinated simultaneous effort between architect, owner, contractor, subs and suppliers. As a result, the pace of the project more than doubled and carried the team to a successful completion. Last weekend, DJ Sober and DJ Blake Ward joined forces with concert. The high-definition zoom cameras, interactive touch screens, telescopes, a free digital photo. The place is excellent and service is great. Beck and the project architect, Gensler, shared an office together on-site. Dallas nightlife is returning in full force as vaccinated party-goers head out into the reopening world. Cloud Nine Cafe At Reunion Tower is very famous and cool place in dallas. Each decision required too much time in discovery, travel time and meetings to discuss. Solution: About one month into the project the team realized that as-built conditions and revisions were going to be ongoing throughout the project in order for it to be completed on time. The piece was built from the lowest level and hoisted upwards towards final connections as each section was completed. The stair includes a built-in-place four-story chandelier with LED lighting inserts. A large paper template (approximately 1,500 SF) was laid out on the floor so wood ceiling supports for video screen and metal clouds could be precisely located. Cloud Nine includes suspended custom metal LED backlit 3 dimensional geodesic metal light boxes on ceiling surrounding suspended video screens. Built in 1978, the original concrete shaftways were not perfect circles, or perfectly located/spaced apart. Constructing a circle out of varying materials is difficult and the design selections allowed for very little, if any, tolerance. Solution: The tower base (lobby) is essentially round. daily.Ĭhallenge: Renovating an existing structure. During the entire 24/7 construction process Beck had sole use of one elevator only between the hours of 2 a.m. A second elevator had to be stopped, cleaned and a protection corridor built daily prior to 5 p.m. for 560 guest use only during restaurant hours of operation. ![]() One elevator had to be available at all times for deliveries. 560 Restaurant had to remain fully operational throughout entire construction process, with restaurant personnel hours of access from 8 a.m. The Cloud 9 revolving restaurant takes its final spin atop the Empire Landmark Hotel on Saturday night. Beck demolished and renovated both the Observation Deck and the floor above it. Solution: The actual upper tower has four levels, all of which are accessible by only three elevators (or stairs). 1897 Point Comfort Beacon, New Jersey. ![]() In 2013, the observation deck and mid deck were renovated for public access.Ĭhallenge: Reduce impact during construction. The restaurant, 560, reopened to the public in 2007 with the remaining spaced available for limited rentals. Nearly 30 years later, Beck fully renovated the tower, including a new fine-dining restaurant, banquet space and upgrades to the elevator system. In 1978, Beck performed construction on a development that included the iconic 50-story Reunion Tower. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |